Line of Demarcation

Why define the Network Model VL line prior to the to New EMS implementation

Consistent Visibility:

  • Ensures consistent visibility of the network model.

Validation:

  • Consistent validation of results with the ISO.

Situational Awareness:

  • Enhances situational awareness.
  • Adheres to industry best practices and NERC EOP-008.

Training Development:

  • Ability to develop consistent training in line with NERC PER 005.

Operational Safety and Reliability:

  • Allows the Control Room to operate safely and reliably in a future state.

End State:

  • Establishes business processes, procedures, and training.
  • Defines the Line of Demarcation and Network Model VL.
  • Positions the control room for future state Transmission and Distribution System technology enhancements.